Total amount of work = LCM(10,15,5) = 30 Efficiency of A: 30/10 = 3units/day Efficiency of B: 30/15 = 2units/day Efficiency of A+B+C = 5 units/day => Efficiency of C=6-3-2=1 unit/day Work done by A+B+C together in 3 days = (3+2+1)×1 = 6 unit Total number of days required to finish the work: 30/6 => 5×3 = 15 days
A bag contains 9 black and 10 white balls. One ball is drawn at random. What is the probability that the ball drawn is white?
...A bag contains 19 white and some black balls. If the probability of drawing a black ball from the bag is twice that of drawing a white ball, find the nu...
Tokens numbered 1 to 350 are in a bag. What is the probability that the Token drawn has a number which is a multiple of 6 or 7?
Two hats are picked at random, what is the probability that one is blue and one is yellow?
There are (m + 6) red roses, (m + 10) white roses and ‘m’ pink roses in a bag. If the probability of picking a pink rose is 5/23, then find the valu...
A bag contains cards numbered between 23 and 92. If one card is drawn from the bag, the probability that the number on the drawn card is a perfect squar...
The probability of selecting a rotten apple randomly from a heap of 250 apples is 0.20. What is the number of rotten apples in the heap?
...A bag contains 9 blue balls, 16 red balls, and 20 green balls. One ball is drawn at random. Find the probability that the ball drawn is either blue or g...
An instructor has a question bank consisting of 200 easy True / False questions, 300 difficult True / False questions, 400 easy multiple-choice question...
A black and a red dice are rolled. Find the conditional probability of obtaining a sum greater than 9, given that the black die resulted in a 5.