Question

    ty-ssc

    6 men can complete the same work in 12 days, 8 women can

    do it in 18 days and 18 children can complete it in 10 days. 4 men, 12 women, and 20 children together can do the work in 2 days. If the remaining work is done only in If the number of men is to be completed in one day, how many men will be required?
    A 36 Correct Answer Incorrect Answer
    B 40 Correct Answer Incorrect Answer
    C 18 Correct Answer Incorrect Answer
    D 24 Correct Answer Incorrect Answer

    Solution

    1 Man can do a work =6×12=72days 1woman Can do a work =8×18 =144days 1 child can do a work = 18×10=180days Now- (4men+12men+20children) can do a work in 2days = (4/72+12/144+20/180)2 = (1/18+1/12+1/9)2 = (9×2/36) =1/2 72 men can do a work in 1 day. The remaining ½ work can be done in a 1 day = 36men