Question
6 men can complete the same work in 12 days, 8 women can
do it in 18 days and 18 children can complete it in 10 days. 4 men, 12 women, and 20 children together can do the work in 2 days. If the remaining work is done only in If the number of men is to be completed in one day, how many men will be required? ty-sscSolution
1 Man can do a work =6×12=72days 1woman Can do a work =8×18 =144days 1 child can do a work = 18×10=180days Now- (4men+12men+20children) can do a work in 2days = (4/72+12/144+20/180)2 = (1/18+1/12+1/9)2 = (9×2/36) =1/2 72 men can do a work in 1 day. The remaining ½ work can be done in a 1 day = 36men
I. p2 – 5p + 6 = 0                 Â
II. 36q2 = 81
...The length of a line segment A, B is 10 units. The coordinates of point A are(2,3) and the value of ordinate of point B is 5. Then find the value of abs...
The ratio of roots of the equation mx2 + nx + n = 0 is α/ β = a/b, then find the value of `sqrt(a/b)+sqrt(b/a)+sqrt(n/m)`
I. 2p2 + 5p + 2 = 0Â Â Â Â Â Â Â Â II. 2q2 + 11 q + 14 = 0
Find the value of 'a' and 'b' which satisfy the following equations:
9a + 7b = 30
4a - 5b = 62
The equations 6x + my + 18 = 0 and 9x + 21y + 27 = 0 have a unique solution. Which of the following statements is definitely true?
If in two linear equations ax + by = c and dx + ey = f and a/d = b/e = c/f then, which of the following is true about the two equations?
If x - √3 y = 8 Find the slope in angle?
If (5√P - 7√Q) = 5, [1.5P = 4Q-(R/3)+9] and (√P/√Q) = 1.6, then find out the value of ‘R’.
Find the area between the lines 18x +12y = 108, 9x  + 6y  = 27, x - axis and y -axis.Â