2 men and 3 boys can do a piece of work in 405 days while 3 men and 2 boys can do the same work in 324 days. In how many days can 5 men and 5 boys do that work?
According to the question, (2M+3B) x405 = (3M + 2B) ×324 810M+1215B=972M+648B 972M-810M=1215B-648B 162M = 567B M = 567B /162=7B / 2 Let 5 men and 2 boys complete the work in (x) days. (5M+5B) x = (3M + 2B) ×324 (5x7B/2+5B) x = (3x7B/2+2B) x324 (35B+10B) ×x/2=(25B×324)/2 (45B×x)/2 =25B×324)/2 X=(324×25B)/45B X=180days.
Value of (x7/x6)6/5 is:
What is the value of x?
0.064 x 0.47 = 0.4x x (0.0256)2
` `
...(5⁴) 5 × (25³)³ = ?
Find the Value of √(-√3+√(3+8√(7+4√3)))?
What is least number which when successively divided by 6, 4 and 4 leaves a remainder 5, 3 and 3 respectively?
(64/25)? × (125/512) ? - 1 = 5/8
Which among the following is the greatest?
296, 372, 460, 548
(0.36)-1.5= ?
If 2x = 3y = 6-z, then (1/x) + (1/y) + (1/z) =?
(0.04)-2.5= ?