Question
A can complete a piece of work in 27 days. He worked for
21 days and then B finished the remaining work in 8 days. In how many days can A and B finish the work together?Solution
A can complete a piece of work in 27 days. A does the work in 27 days =1 A does the work in 1 day =1/27 A does the work in 21 days = (1/27) ×21=7/9 Remaining work =1-7/9 =2/9 Remaining work finished by B in 8 days =8×9/2=36days. A and B together finish the work – 27               36          108 4                 3 =108/4+3 =108/7  =15(3/7) days.
A man rows upstream 18 km and downstream 30 km taking 6 hours each. Find the man’s speed in still water.
Calculate the speed of a boat in still water if it travels 176 km downstream in 11 hours and returns 144 km upstream in 18 hours.
A boat can cover a distance of 64 km downstream in 4 hours less time than it takes to travel the same distance upstream. If the current of the stream fl...
A boat has a speed of 52 km/h in still water. It takes 8 hours to travel from point B to point A downstream. The total distance between the two points ...
The speed of the boat in still water is 9 km/hr and the speed of the stream is 6 km/hr. A boat goes 90 km downstream with its usual speed but at the tim...
A man rows upstream 10 km and downstream 15 km taking 5 hours each. Find the speed of current.
A boat takes 8 hours to travel 240 km upstream. If the speed of the boat in still water is 40 km/h, how much time will it take for the boat to travel 12...
A man rows 240 km upstream in 5 hours and 360 km downstream in 5 hours. Find the time required to row 300 km in still water.
A boat goes 200 km downstream in 50 hours, and 90 km upstream in 30 hours. The speed of the stream is
The speed of a boat in still water is 7 km/hr and the speed of the stream is 2.5 km/hr. A man rows to a place at a distance of 42.75 km and comes back t...