A can complete a piece of work in 27 days. A does the work in 27 days =1 A does the work in 1 day =1/27 A does the work in 21 days = (1/27) ×21=7/9 Remaining work =1-7/9 =2/9 Remaining work finished by B in 8 days =8×9/2=36days. A and B together finish the work – 27 36 108 4 3 =108/4+3 =108/7 =15(3/7) days.
A rise in the general level of prices in an economy is termed as?
Which entomopathogens fungus role as biological control agent in cotton bollworm?
What does the "FASAL" project stand for and focus on?
International Irrigation Management Institute (IIMI) is located at
What is the recommended light intensity for Dendrobium orchid cultivation?
What is the designated amount of floor space needed in covered area for young calves, taking into consideration optimal conditions for their well-being ...
The entry of water into the soil is called ___
Which of the following element is not involved in chlorophyll structure?
The optimum sowing time of ‘toria’ in Punjab is:
Winds and air currents differ in the aspect that: