Question
βAβ can complete a work in 15 days and is 50% more
efficient than βBβ. βAβ and βBβ start working together and βAβ leaves after 8 days. The rest of the work is completed by βBβ alone in βxβ days. Find the value of βxβ.Solution
ATQ, Time taken by βBβ to complete the work = 1.5 Γ 15 = 22.5 days (round up to 23 days) Let the total work = 230 units Efficiency of βAβ = 230/15 = 15.33 units/day (round to 15 units/day) Efficiency of βBβ = 230/23 = 10 units/day Work completed by βAβ and βBβ in 8 days = (15 + 10) Γ 8 = 200 units Therefore, x = (230 β 200)/10 = 3 days
Four friends are jogging on a circular track starting from the same point. Their strides are 48 cm, 54 cm, and 72 cm respectively. What is the least dis...
Find the number of factors in 1750.
How many integer pairs (x, y) satisfy the inequality x2 + 4y2 < 100?
If the numerator of a fraction is increased by 200% and the denominator is increased by 400%, the resultant fraction is 9/25 . What was the original fra...
- A 7-digit number β538p7q2β is divisible by 24. Determine the minimum possible value of (p Γ q).
- Find the minimum value of x if the number 87256x72 is divisible by 9.
In a group of three numbers first is double of second and half of third. The average of three numbers is 42. Find the difference between the first numbe...
A school is organizing a trip and needs transportation for 180 students. Each bus can carry 45 students. If the school rents 4 buses and 2 vans, with ea...
Two numbers P and Q are in the respective ratio 7: 9 and their sum is 80. Then, P is equal to:
A number exceeds 45 times its reciprocal by 5/6. Find the number.