Start learning 50% faster. Sign in now
Get Started with ixamBee
Start learning 50% faster. Sign in nowATQ, Time taken by ‘B’ to complete the work = 1.5 × 15 = 22.5 days (round up to 23 days) Let the total work = 230 units Efficiency of ‘A’ = 230/15 = 15.33 units/day (round to 15 units/day) Efficiency of ‘B’ = 230/23 = 10 units/day Work completed by ‘A’ and ‘B’ in 8 days = (15 + 10) × 8 = 200 units Therefore, x = (230 – 200)/10 = 3 days
What’s the total horticulture production of India as per the 2nd advance estimates of 2020-21
How do plants establish a pressure gradient to facilitate water movement in the soil?
Which of the following group of soil is the largest and most important group of India?
Albedo of dry black soil _____ than moist black soil
Which is the yellow coloured variety of capsicum?
In stale seed bed preparation
Which of the following is not the objective of puddling in rice
Malpighian tubules of insects are
ICRISAT is Located at?
Which of the following practice reduce soil erosion, evapotranspiration, kinetic energy impact of rain drops?