ATQ, Time taken by ‘B’ to complete the work = 1.5 × 15 = 22.5 days (round up to 23 days) Let the total work = 230 units Efficiency of ‘A’ = 230/15 = 15.33 units/day (round to 15 units/day) Efficiency of ‘B’ = 230/23 = 10 units/day Work completed by ‘A’ and ‘B’ in 8 days = (15 + 10) × 8 = 200 units Therefore, x = (230 – 200)/10 = 3 days
Which distribution is often used to model the time between events in a Poisson process, such as the time between customer arrivals at a store?
Which network layer protocol is responsible for multicasting, where a packet is sent to multiple destinations simultaneously?
Which cryptographic system uses two different keys for encryption and decryption?
Which isolation level allows transactions to read uncommitted changes made by other transactions?
Which SQL statement is used to delete data from a database table?
Which programming language is used to add interactivity and dynamic content to websites?
Which type of routing algorithm considers factors such as link cost and bandwidth to find the best path for data packets?
A shift register is an example of a sequential circuit used for:
Which component of an ER diagram represents an attribute?
Store data in single table