Question
Nakul can do a piece of work in 12 days; Aaravya is 50%
more efficient than Nakul. How much more time does Nakul take than Aaravya to do the same piece of work?Solution
Nakul can do a piece of work = 12 days. Let the efficiency of Nakul =100 So, Aaravya’s efficiency =150. [Nakul][Aaravya] 100150 2:3Efficiency 3:2time. ATQ- 3=12 1=4 Aaravya’s time =2×4=8. Maximum time =12-8 =4days.
The Debt Equity ratio of a company is 0.4. Which of the following will change the Debt Equity Ratio?
What is the primary purpose of a cashbook?Â
Which of the following act is not administered by RBI?
Local currency account maintained by a local bank for a foreign (correspondent) bank is called-
Which of the following is not one of the Domestic Systemically Important Banks (D-SIBs)?
Banks’ non-food credit growth accelerated to 9.3 per cent in December from 6.6 per cent in the same period of the last year. Which of the followin...
__________________ became the largest and fastest-growing UPI beneficiary bank in India
Which of the following is the most volatile foreign capital?
Which of the following is the most volatile foreign capital?
National Pension System (NPS) is a voluntary, defined contribution retirement savings scheme. NPS is regulated by?Â