Rahul, Sameer, and Dinesh can
complete a task in 24 days, 36 days, and 18 days, respectively. They started working together, but Rahul left after 3 days. How long will it take Sameer and Dinesh to finish the remaining task?Solution
ATQ,
Let the total work be 432 units. Efficiency of Rahul = 432 ÷ 24 = 18 units/day Efficiency of Sameer = 432 ÷ 36 = 12 units/day Efficiency of Dinesh = 432 ÷ 18 = 24 units/day Work done in the first 3 days = 3 × (18 + 12 + 24) = 162 units Remaining work = 432 – 162 = 270 units Required time = 270 ÷ (12 + 24) = 270 ÷ 36 = (135/13) or Â
A compound that is a white solid which absorbs water vapour from the air is
Deficiency of _________ causes the leaves to develop a dark green colouration.
What is the focal length of a double convex lens for which the radius of curvature of each surface is 30 cm and the refractive index of glass is 2.50 ?
A body of mass 2 kg is moving in SHM with angular frequency 4 rad/s and amplitude 0.1 m. Max kinetic energy is:
A person is hurt on kicking a stone due to –
Two waves, each of amplitude 1.5 mm and frequency 10 Hz, are travelling in opposite direction with a speed of 20 mm/s. The distance in mm between adjace...
Silver bromide when kept in sunlight undergoes a change in color. What is the color formed?
Which of the following devices stores electrical energy in a magnetic field?
Which among the following is produced using ‘Haber Process’?
A current-carrying conductor is placed perpendicular to a uniform magnetic field. The force on the conductor is given by: