Question
14 women working 8 hours a day
can complete a piece of work in 30 days. What is the time taken by 28 men working 5 hours a day to complete the work if the efficiency of a woman is 30% less than that of a man?Solution
ATQ,
Let the efficiency of a man be '5a' units/day. So, the efficiency of a woman = 0.70 × 5 = '3.5a' units/day. Total work = 14 × 3.5a × 8 × 30 = '11760a' units. So, time taken by 28 men working 5 hours a day to complete the work: = 11760a ÷ (28 × 5a × 5) = 16.8 days.
Select the INCORRECtLY spelt word.
Banana is vegetatively propagated through
Which method of training system is commonly used in Aonla?
What is the recommended light intensity for Dendrobium orchid cultivation?
Match list I with list II
Soil texture can be determined by
How an acid affect the microorganism when combined with heat
The sodium hazard (Sodicity hazard) of irrigation water are often expressed through SAR. What shall be considered a safe SAR value for irrigation water ...
The intersection of the demand and supply curves indicates the equilibrium:
Challenges in Minimum Support Price does not  includes