A is capable of finishing a task in 60 days. B requires 40% more time than A to finish the same task. How many days will A and B need to complete 80% of the work together?
Time taken by B to complete the whole work = 1.40 × 60 = 84 days Let total work = 420 units (LCM of 60 and 84) Efficiency of A = 420/60 = 7 units per day Efficiency of B = 420/84 = 5 units per day Desired time = (0.80 × 420)/12 = 28 days
Which of the following forms a part of National Agricultural Research System (NARS), aimed at assessment of location specific technology modules in agri...
The ratio between organic N and S in crop residue generally ranges between:
Central AGMARK Lab is located at
Which sub-surface drainage system consists of laterals that enter the main drain at an angle, generally from both sides?
Awn character in rice (awn & awnless) is an example of ____
Which classification class of Chrysanthemum is characterized by blooms that are globular, somewhat flat in the young stage, or small button type?
The part of MB plough that resists the side pressure exerted by the furrow slice on the mould board is:
Which of the following is selective herbicides that can be filled in the blank “a”?
Enzyme involved in conversion of sucrose into glucose and fructose is
Which of the following plant species is used to produce soft rot resistance through protoplasm fusion?