Start learning 50% faster. Sign in now
Let the efficiency of A and B be 15 units per day and 17 units per day, respectively. So, total amount of work = (15 + 17) X 30 = 960 units Time taken by A alone to compete the whole work = 960/15 = 64 days Hence, option c.
A train 200 metre long takes 20 sec to cross a man running at a speed of 4 km/hr in the direction same to that of train. What is the speed of the train?
A train 500 m long running at 90 km/hr takes 40 seconds to cross a bridge. The length of the bridge is
A train 600 metres long is running at a speed of 54 km/hr. If it crosses a tunnel in 1 minute, then the length of the tunnel (in meters) is: