Question
A, B, and C can finish a work in 12, 15, and 20 days,
respectively. They all start working together, but A leaves after 4 days, and B leaves after 1 more days. How much longer will C take to finish the remaining work?Solution
Work done by A in 4 days = 4 / 12 = 1/3. Work done by B in 5 days = 5 / 15 = 1/3. Total work done by A and B = 1/3 + 1/3 = 2/3. Remaining work = 1 - 2/3 = 1/3. Work done by C per day = 1/20. Time taken by C to finish 1/3 work = (1/3) / (1/20) = 20 / 3 = 6.67 days But since 5 days he was working with them, which means he will take extra = 6.67 – 5 = 1.67 days Correct answer: a) 1.67 days.
398Â Â Â 308Â Â Â 228Â Â Â 158Â Â Â 98Â Â Â ?
4096 2048 514 64 4
...Find the maximum number of trees which can be planted, 25 meters apart, on the two sides of a straight road 2125 meters long
95    216    72    241    ?    270
Identify the given logic and complete the series with the correct option. 12, 15, 18, 20,?
Four terms are in proportion. The first, second and fourth terms are 4, 22, and 33. Find the third term.
147      138       120      93      ?      12
...The question below are based on the given Series-I. The series-I satisfies a certain pattern, follow the same pattern in Series-II and answer the quest...
4 5 12 39 160 ?
...3 5 15 75 1125 ?
...