Start learning 50% faster. Sign in now
A’s rate of work = 1/16, B’s rate of work = 1/12. Together, their rate of work = (1/16 + 1/12) = (3 + 4) / 48 = 7 / 48. Therefore, the time taken to complete the work = 48 / 7 = 6.86 days.
Trichogramma chilonis is
The rotation intensity of rice-wheat-rice-fallow rotation will be:
Which of the following has been used for inducing male sterility in Bajra ?
Which of the following is not a product category covered by APEDA?
_______ marking decisions in research objectives.
Aluminium Phosphide is an example of:
Black cotton soil is best for cotton cultivation because of
TDN stands for:
What is repo rate?
The period between ecdyses are the stages called _____ in insects