Question
A can do a work in 16 days and B can do the same work in
12 days. How long will it take for A and B to complete the work if they work together?Solution
A’s rate of work = 1/16, B’s rate of work = 1/12. Together, their rate of work = (1/16 + 1/12) = (3 + 4) / 48 = 7 / 48. Therefore, the time taken to complete the work = 48 / 7 = 6.86 days.
P and Q together started a business with initial investment in the ratio of 1:4, respectively. The time-period of investment for P and Q is in the ratio...
- Bag A contains 3 red, 4 black, 8 blue and 5 yellow balls. Bag B contains 5 red, 2 black, 4 blue and 3 yellow balls. Find the probability of drawing 2 blue ...
The likelihood that Maya secures a place in college D is 90% and in college E is 85%. Maya's order of preference is 'D', then 'E', and finally 'F'. Assu...
All the sides of a 3-inch solid cube are painted. The cube is then cut into cubes of equal size to 1 inch each. If a cube is chosen at random, what is t...
A bag contains 9 Green and 10 Red balls. One ball is drawn at random. What is the probability that the ball drawn is Red?
A bag contains 7 yellow balls, 5 black balls and 3 red balls. Two balls are drawn simultaneously. Find the probability that both the balls are of same ...
In a lottery, there are 6 prizes and 30 blanks. A lottery is drawn at random. What is the probability of getting a prize?
What is the probability that a number selected from 1,2,3.......................68,69,70, is perfect square or a perfect cube?
- If 5 coins are tossed at a time what's the probability of getting exactly one head?
A coin is tossed successively three times. Find the probability of getting exactly one tail or two tails?