Question
Aman, Bhanu, and Chinu can
complete a piece of work individually in 20 days, 30 days, and 60 days, respectively. How many days will Aman take to finish the work if Bhanu and Chinu assist him every third day?Solution
ATQ,
Work Rates: Aman completes 1/20 of the work per day. Bhanu completes 1/30 of the work per day. Chinu completes 1/60 of the work per day.
Work Schedule:
Total Time: In 3 days, 1/5 of the work is completed. Total work = 1 unit. Cycles needed = 1/(1/5) = 5. Total time = 5×3 = 15 days.
Which of the following State/ UT has been declared as Free Area for purposes of Prevention and Control of Infectious and Contagious Diseases in Animal...
To use the exact same font type, size and colour in the title of all the slides in a PowerPoint presentation, you will:
When two well developed breeds are crossed alternatively is knowns as ?
Thrips transmits plant virus belongs toÂ
Test cross ratio for the monohybrid is
The type of activity of Bacillus Megaterium bioinoculant in soil is
Which one of the following is best stage for the harvesting of Anthurium  Â
The Central Institute of Post-Harvest Engineering and Technology (CIFHET), is situated at:
 The science that deals with the aspects of meteorology having direct relevance to agriculture is called
Which nematode behavior is characterized by a spiral shape in the habitus?