Question
Working together A and B can do a job in 40 days, B and
C in 36 days and all three together in 24 days. In how many days can B alone do the job?Solution
Given that three people together can do the work in 24 days (1/a)+(1/b)+(1/c)=1/24 Also given (1/b) +(1/c)=1/36 1/a =1/24 - 1/36 1/a =(3-2)/72 a=72 days (1/72)+(1/b)=1/40 (1/b)=(1/40)-(1/72) (1/b)=9-5/360 1/b =1/90 b=90 days
Which of the following organs is capable of removing unused or damaged platelets?
Which of the following is/are a type of industrial dispute?
I. Interest disputes
II. Right...
A boat's speed while moving downstream is 60% higher than its speed while moving upstream. If the boat covers 720 km downstream in 18 hours, determine ...
Ajay invested Rs.a in SI at 8% rate of interest per annum for 10 years. Vishal invested the same amount in SI at 5% rate of interest per annum for 6 yea...
What is the minimum number of employees required for an establishment to come under the purview of the Maternity Benefit Act, 1961?
A rectangular ground is 70 metre long and 50 metre broad. If two 20 metre wide paths one parallel to the breadth and one parallel to the length, of the�...
In April 2023, which Tiger Reserve secured the top position in the Excellence category during the 5th Management Effectiveness Assessments?
Soil erosion is one of the major threats to the environment. Which of the following can help to prevent erosion of soil?
Kannadippaya has received the Geographical Indication (GI) tag, ensuring market protection and global recognition, it is
Two trains of same length are running in parallel tracks in the same direction with speed 70 km/hr and 120 km/hr respectively. The latter completely cro...