A’ and ‘B’ together can complete a work in 8 days, while ‘B’ and ‘C’ together can complete the work in 12 days. If ‘B’ takes 20 days to complete the work alone then find the time taken by all three together to complete 47.5% of work.
Let the total work = 120 units Efficiency of (A + B) = 120/8 = 15 units/day Efficiency of (B + C) = 120/12 = 10 units/day Efficiency of ‘B’ = 120/20 = 6 units/day Efficiency of (A + B + C) = (15 + 10 – 6) = 19 units/day Required time taken = (0.475 × 120)/19 = 3 days
Which of the following pairs of phenomena illustrate the particle nature of the electromagnetic radiation?
Which of the following electromagnetic waves are used for detection like Geiger tubes?
Which of the following is caused due to the Newton’s first law of motion?
I. When a motorcar makes a sharp turn at a high speed, we tend to ...
When a bottle of scent is kept open in a corner of a room its odour is felt in all parts of the room. This is clue to the phenomenon of –
Which of the following materials behaves as a dielectric?
A meter stick moves along its length with a certain speed. The apparent length of the moving meter stick as measured by a stationary observer on the gr...
Newton's rings can be obtained in:
The electric and magnetic fields of an electromagnetic wave are _____________
In a concave mirror which of the following pair of position of object – size of the image is correct?
I. At infinity – point sized
A potentiometer wire of length 1 m has a resistance of 5 Ω. It is connected to a 8 V battery in series with a resistance of 15 Ω. Determine the emf ...