Question
If 12 persons working 12 hours a day dig 12 meters of a
tunnel in 12 days how many men are required to dig additional 4 meter of the tunnel (of the same dimension) given that they work 4 hours a day for 4 day?Solution
ATQ, we can say that Given: 12 persons working 12 hours a day dig 12 meters of a tunnel in 12 day Let the number of men required be x (12 × 12 × 12)/12 = (x × 4 × 4)/4  x = 36 ∴ Number of men required be 36
The capital of European Union is located at:
The Ideal temperature for the growth of Bajra is between
Consider the following events in the formation of ‘Karewas’:
1. Formation of a lake
2. Deposition of glacial clay
3. Draining o...
Boundary line between Germany and Poland
The Brahmaputra, Irrawady and Mekong rivers originate in Tibet and flow through narrow and parallel mountain ranges in their upper reaches. Of these riv...
Consider the following pairs:
How many pairs given ab...
Which of the following is the largest freshwater lake in India?
Consider the following plateaus of central India:Â
1. Baghelkhand
2. Bundelkhand
3. Malwa Plateau
4. Chotanagpur Plateau
_______ is the not the sedimentary rock.Â
Which Indian state is referred to as "The Land of Dawn-Lit Mountains"?