Speed of the train = 45 × (5/18) = 12.5 m/sec Length of the train = 12.5 × 10 = 125 metres Let the length of the platform be ‘x’ metres Therefore, 125 + x = 12.5 × 20 Or, x = 250 – 125 = 125 metres
18000 3000 600 150 40 25
127, 137, 148, 164, 169, 185, 199
In each of the following giving number series, a wrong number is given. Find out the wrong number?
46 23 23 34.5 70 172.5
...72, 36, 54, 135, 470.5, 2126.25
217 210 236 299 423 640
...22, 23, 31, 57, 122, 247
132, 136, 109, 125, 2, 36
5000, 4500, 3600, 2480, 1512, 756
12, 18, 40, 90, 270, 945
970, 934, 920, 893, 884, 880