ATQ, 2 × 2 = 4 4 × 3 = 12 12 × 4 = 48 48 × 5 = 240 240 × 6 = 1440 1440 × 7 = 10080 Therefore,12 should come in place of 16.
A, B, and C can complete a piece of work separately in 10, 20 and 40 days, respectively. In how many days will the work be completed if A is assisted by...
√440.98 + (17.95% of 249.96 – 12% of 99.99) + (7.12)2 = ?
(5.08/3.01) of 41.99 - 24.99% of 120.09 = ? - 9.99
116.90 ÷ (77.81 ÷ 6.06) + 6.32 = (15.12% of ?) ÷ 4.652
75.01 + 344.923 - 179.93 = ?3 of (√678 + 3.89)
1359.98 ÷ 30.48 × 15.12 = ? × 4.16
20.22% of (74.9 × 6.01) + 69.97 =?
?% of (140.31 ÷ 19.97 × 80.011) = 139.98
(4913)1/3 × 10.11 × 13.97 ÷ 20.32 = ? + 39.022
15.08% of (133.13 + 146.928) + 8.033 - (8.98 of 6.01) = ? of (46.09 - 20.98)