Start learning 50% faster. Sign in now
The words are rearranged in increasing order of their length and when there is a tie in length then they are arranged according to the dictionary, from left to right. Numbers are rearranged in descending order from right to left. In each step a word and a number is arranged. Input: 25 mythologic 54 length 96 words 41 alliance 87 76 important analysis Step I. words 25 mythologic 54 length 41 alliance 87 76 important analysis 96 Step II. words length 25 mythologic 54 41 alliance 76 important analysis 87 96 Step III. words length alliance 25 mythologic 54 41 important analysis 76 87 96 Step IV. words length alliance analysis 25 mythologic 41 important 54 76 87 96 Step V . words length alliance analysis important 25 mythologic 41 54 76 87 96 Step VI. words length alliance analysis important mythologic 25 41 54 76 87 96
7 men and 4 boys can complete a work in 6 days. A man completes double the work than a boy. In how many days will 5 men and 4 boys complete the work?
A and B individually can complete the work in 30 days and 45 days respectively. If the time taken by C alone to complete the work is 1.5 times the time ...
A team leader can do a job as fast as three members of the team working together. If one of the member can do the job in 5 hrs, the second one takes 10 ...
Some Category of workers can complete a decided project in 20 days. However, due to some unpredicted situation, 5 workers were absent. That’s why, the...
Aman, Bishnu, and Chintu can each complete 20%, 25%, and 60% of the work in 4 days, 9 days, and 27 days, respectively. If all thr...
Ram can do a piece of work in 50 days. He alone worked at it for 20 days and then Lakshman completed alone the rest work in 30 days. In how many days, t...
A cheetah can catch a deer running with a speed of 108 km/h and is 66 meters ahead of it, in 12 seconds. Find the time taken by the cheetah to catch a z...
Pawan and Qureshi can individually complete a certain task in 5 hours and 15 hours, respectively. Pawan begins the task at 9:00 a...
16 men can complete a work in 10 days. 10 men started the same work and left after working for ‘y’ days. The remaining work is completed by 6 men in...
Numan does 4/ 5 half the work as Gagan in time. If together they take 16 days to complete a piece of work, then how long will Gagan take to complete the...