Question
A series is given with two terms missing. Choose the
correct alternatives from the given ones that will complete the series. 54, 55, 63, 72, ____, 161, 377, ____.Solution
54 + 1² = 54 + 1 = 55 55 + 2³ = 55 + 8 = 63 63 + 3² = 63 + 9 = 72 72 + 4³ = 72 + 64 = 136 136 + 5² = 136 + 25 = 161 161 + 6³ = 351 + 216 = 377 377 + 7² = 567 + 49 = 426
Team A can built a project in 6 hours less than the time taken by Team B to built the same project.
The ratio of the strength of Team A to that o...
‘P’ alone can do 60% of a work in 18 days and ‘Q’ alone can do 30% of the same work in 9 days. ‘P’, ‘Q’ and ‘R’ together can finish ...
- If Ankit takes four times the time that Ravi takes or five times the time that Sandeep takes to finish a task, and all three working together can complete ...
- Sneha alone can type a report in 14 days, while Reena can do it in 21 days. If both work together and earn Rs. 14,700 for the job, how much will Reena get?
- Ritu completes 50% of a project in 25 days, while Sheetal completes 40% in 32 days. Ritu works for 30 days and then stops. Find the time Sheetal needs to f...
Amit can do certain work alone in 'w' days. Arjit can do the same work alone in (w + 12) days.Gaurav started working and did (1/2) the work at the effic...
P and Q together can do a piece of work in 30 days, Q and R together can do it in 20 days. P starts the work and works on it for 5 days, then Q takes it...
- Neha and Seema can finish a work in 10 days and 25 days, respectively, when working alone. Neha started the work. After how many days should Seema join to ...
Pipe 'A' can fill a tank on its own in 14 minutes. When pipes 'A' and 'B' are both opened at the same time, the tank is filled in 18 minutes. Determine ...
A can complete a work in 10 days and B in 15 days. They work together for 3 days. How much work is left?