Question
Who lives immediate below
J? Study the following information carefully and answer the question given below: There are eight people I, J, K, L, X, Y, Z and A are living in a 8 floor Building on different floors from top to bottom (such as ground floor is numbered as 1 and top floor is numbered as 8) but not necessarily in the same order. I lives on an even-numbered floor but not on the floor numbered second or fourth. Only three floors are there between I and J. Only two people live between K and X. Y lives on a floor above L. There are equal numbers of floors between the floors on which X and J live and between the floors on which I and X live. A lives immediately below Lβs floor. Z lives immediately below Iβs floor.Solution
1. I lives on an even-numbered floor but not on the floor numbered second or fourth. 2. Only three floors are there between I and J.  3. There are equal numbers of floors between the floors on which X and J live and between the floors on which I and X live. 4. Only two people live between K and X. 
 5. Y lives on i floor above L. 6. A lives immediately below Lβs floor. 7. Z lives immediately below Iβs floor 
 There is no flat empty for A and L in CASE2A soCASE2A is cancelled out.Y lives on a floor below L in CASE2B so CASE2B is cancelled out. Final arrangement: 
- Ajay, Bablu and Chirag can complete a certain work in 21, 28 and 15 days respectively. Ajay and Chirag started the work while Bablu joined them after 5 ... 
- Aβ and βBβ together can complete a work in 25 days while βAβ takes 30 days to complete the same work alone. If βCβ is 20% more efficient t... 
- A and B together can complete a piece of work in 12 days, while B and C together can complete the same work in 15 days. A and C together can complete th... 
- 'A' can complete a certain task in 60 days, while 'B' can do the same in 45 days. 'A' starts the task and works alone for 18 days, after which 'B' joins... 
- P can do a piece of work in 25 days, Q can complete double the work in 40 days and R can do the work in 30 days. If all of them together earn Rs. 7400, ... 
- A man completes a work in 16 days. A woman finishes half of that work in 10 days. How many days will they take together to finish 75% of the work?
- 'P' and 'Q' together can complete a task in 20 days. 'P' alone would take 12 days fewer than 'Q' to finish it. How many days would 'Q' take to do the work ...
- The speeds of Vishank and Karun are 60 km/hr and 90 km/hr. Initially, Karun is at a point P and Vishank is at a place Q. The distance between P and Q i... 
- A can complete a work in 20 days. B takes 10 days less than A to complete the same work. In how many days can both of them together complete 90% of the ... 
- The time taken by βAβ to build a wall alone is 40% more than the time taken by him to build it along with βBβ. βBβ will take how much percen...