Question
How many boxes were there between Orange and White
coloured box? Study the following information carefully and answer the question given below: Six boxes of different colours were stacked one above the other in an almirah. Orange coloured box was placed below Gray coloured box, which was placed immediately above the Brown coloured box. Neither the Yellow nor Blue coloured box was placed at the bottom of the stack. Orange coloured box was placed below the White coloured box, which was placed at the gap of 2 boxes below Blue coloured box. Yellow coloured box was not placed adjacent to White coloured box.Solution
Orange coloured box was placed below the White coloured box, which was placed at the gap of 2 boxes below Blue coloured box. Here, we have three possible scenarios in which the above hints can be used accordingly. Case 1:Â Â Box Colour Blue White Orange Orange coloured box was placed below Gray coloured box, which was placed immediately above the Brown coloured box. After, using the above hints, we have:
‘A’ can do a piece of work in 20 days. ‘B’ can do 80% of the same work in 30 days. If they work together for the entire time and get paid Rs.161...
A and B together can complete a piece of work in 12 days, while B and C can complete it in 15 days. A, B, and C together can complete the same work in 8...
A and B together can complete a piece of work in 48 days while B and C together can complete the same work in 58 days. All of three together can complet...
60 men can complete a piece of work in 12 days. 12 men started the same work and worked for 10 days, and then joined by ‘x’ more men such that the r...
Sneha and Meena can complete a project in 24 days and 60 days respectively. Sneha began working first. After how many days should Meena step in so that ...
Three machines P,Q and R were hired by a company for a month. Machine P runs 18 hours for 15 days, machine Q runs 20 hours for 18 days and machine R run...
When working alone, Ansh takes 12 more days than time taken by Ansh and Balu together to finish certain work. If Ansh is 50% more efficient than Balu, t...
A work is done by A, B, C and D together. The percentage of work done by A, B C and D are in arithmetic progression (AP). The first, second, third and f...
Akhil and Nikhil together can complete a work in 10 days while Nikhil alone takes 20 days to complete 40% of the work. If the efficiency of Sachin is 25...
- X and Y can complete a piece of work in 20 days. They worked for 10 days and left. Z completed the rest of the work in 10 days. Find how long Z would take ...