Start learning 50% faster. Sign in now
P was born in July. Q’s birthday is before N. Q wasn’t born in July. Birthdays of both Q and N are in the same month. Therefore, both Q and N may have their birthdays in January, April or May. T’s birthday is immediately after N’s. The number of persons who have their birthdays between the birthdays of S and T is equal to the number of persons who have their birthdays between the birthdays of N and P. If N’s birthday is on 23 rd May or on 23 rd January, then as shown in figure, the condition of the equal no. of birthdays between S and T, and N and P won’t be met.(refer to the below table)
The number of persons who have their birthdays between the birthdays of S and T is equal to the number of persons who have their birthdays between the birthdays of N and P. R does not have birthday in May. There are three birthdays between the birthdays of R and O. Now there are two possible dates for P’s birthday u.q. 14th July and 23rdJuly. First let us assume P's birthday on 14th July-
But, the condition that there are three birthdays between the birthdays of R and O wouldn’t be met in the above arrangement. Therefore, assuming P’s birthday is on 23rd July and redrawing the table, we get-
Two trains of length 200m and 160m respectively are running on parallel lines of rails. When running in the same direction the faster train passes the s...
A can cultivate 3/5th of the land in 15 days and B can cultivate 1/4th of the land in 10 days. In how many days working together A...
A, B and C can individually complete a piece of work in 24 days, 15 days and 12 days,respectively. B and C started the work and worked for 3 days and le...
A trip from Mumbai to Pune takes 4 hours 30 minutes at a speed of 60 km/hr. How long (in hours) will it take to complete, if the speed is 15m/sec?
A mobile plan costs Rs.32 for 6 minutes. What is the approximate cost, rupees, for 4 minutes?
X, Y and Z together can complete a work in 15 days. X and Y together can complete the same work in 30 days. Z alone can finish the same work in how man...
A man can do a piece of work in 30 hours. If he works with his son then the same piece of work is finished in 20 hours. If the son works alone he can do...
A can do 50% of the job in 16 days, B can do 1/4th of the job in 24 days. In how many days can they do 3/4th of the job working together?
A can finish the work in 40 days and B in 30 days. They both work together for 5 days and then B leaves. How many days will A take to complete the remai...
What is the angle traced by the hour hand in 23 minutes?